OEM Supply Pizza Making Machine Cost - Automatic Pizza Production Line Machine – Chenpin

Technical Details

Related Video

Feedback (2)

Our commission would be to serve our customers and clientele with very best excellent and aggressive portable digital products for Roti Heater, Automatic Dough Laminator Machine, Ikon Roti Maker, We have been one of your largest 100% manufacturers in China. A lot of large trading businesses import products and solutions from us, so we can easily give you the most beneficial price tag with the same quality for anyone who is interested in us.
OEM Supply Pizza Making Machine Cost - Automatic Pizza Production Line Machine – Chenpin Detail:

CPE-2370 Automatic Pizza Production Line

Paratha dough ball forming line details.

Size  (L)15,160mm * (W)2,000mm * (H)1,732mm
Electricity  3 Phase,380V,50Hz,9kW
Application Pizza base
Capacity  1,800-4,100(pcs/hr)
Production Diameter 530mm
Model No. CPE-2370


1576029952

Pizza


Product detail pictures:

OEM Supply Pizza Making Machine Cost - Automatic Pizza Production Line Machine – Chenpin detail pictures


Related Product Guide:

We offer fantastic energy in high quality and enhancement,merchandising,profits and promoting and procedure for OEM Supply Pizza Making Machine Cost - Automatic Pizza Production Line Machine – Chenpin , The product will supply to all over the world, such as: moldova, Moscow, Macedonia, As a well educated, innovative and energetic staff,we are responsible for all elements of the research, design, manufacturing, sales and distribution. With studying and developing new techniques,we are not only following but also leading the fashion industry. We listen attentively to the feedback from our customers and provide instant communication. You will instantly feel our expertise and attentive service.
  • We feel easy to cooperate with this company, the supplier is very responsible, thanks.There will be more in-depth cooperation.
    5 Stars By Georgia from Adelaide - 2017.09.29 11:19
    This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.
    5 Stars By May from Swiss - 2017.12.19 11:10
    Write your message here and send it to us